.. 15th June, 1897
Second half of North Channel,
buoys and beacons ... ... 31st March, 1898
The timber sea-wall was built to a level of 16 feet above low water, and
the stone sea-wall to 19 feet. Originally there were built three sheds
in the South Basin, three sheds and two warehouses in Dock No. 1, two
warehouses and two sheds in Dock No. 2, five warehouses in Dock No. 3,
and four warehouses in Dock No. 4, the total capacity of these sheds and
warehouses being 525,510 cubic metres, and the floor area 192,800 square
metres. Since then, several warehouses have been built, and some burnt
down. The total cost of the harbour works as contracted for by Ed.
Madero was $35,000,000 gold, or, say, about L7,000,000. This includes
the South Basin, Dock No. 1, Dock No. 2, Dock No. 3, Dock No. 4, North
Basin, North Channel, Graving Docks, machinery, etc.
The following statement shows the total tonnage that passed through the
port of Buenos Aires in 1880, 1890, 1900, and 1909, and clearly shows
the advance made in the last 30 years.
These figures include steamers and sailing-vessels, and local as well
as foreign trade.
1880 ... ... ... 644,750 tons
1890 ... ... ... 4,507,096 tons
1900 ... .